Illinois Tollway I-17-4298

The project began in January of 2018 and has a projected duration of 2 years.  American First Contracting, Inc. will assist the (DSE) with the reconstruction and rehabilitation of the Central Tri-State Tollway (I-294) between the I-55 Ramps and Ogden Avenue; work that is anticipated to be constructed in eight construction packages.  The scope of work includes: Assist with Removal/Existing Conditions Plans, Assis with the preparation of Noise Abatement Wall General Plan & Elevation Sheets, Boring Logs Sheets, Assist with Removal/Existing Conditions Plans, Assist with preparation of Barrier Warrant Analysis Level 0 and Level 1 Tables and Location Plans.